| PART |
Description |
Maker |
| 3302-20 3302-26 3302-25 3302-15 3302-34 3302-16 03 |
28 AWG wire on .050 inch centers permits mass termination to a broad line of IDC connectors RIBBON CABLE 26 WAY 30.5M 带状电缆26未来30.5 RIBBON CABLE 10 WAY PER M 带状电缆每平方米10未来 RIBBON CABLE 10 WAY 30.5M 带状电缆10未来0.5 RIBBON CABLE 34 WAY 30.5M 带状电缆34未来30.5 RIBBON CABLE 16 WAY 30.5M RIBBON CABLE 15 WAY RIBBON CABLE 25 WAY 30.5M RIBBON CABLE 20 WAY 30.5M
|
3M Electronics Mimix Broadband, Inc. ITW Pancon Electronic Theatre Controls, Inc. Ecliptek, Corp.
|
| X9448YP24-2.7 X9448YP24I-2.7 X9448WP24-2.7 X9448WP |
VGA VIDEO CABLE 100 FT FF 混合信号2线接 Mixed Signal with 2-Wire Interface 2.5K DIGITAL POTENTIOMETER, 2-WIRE SERIAL CONTROL INTERFACE, 64 POSITIONS, PDSO24 VGA VIDEO CABLE 35 FT FF 混合信号2线接 Hook-Up Wire; Conductor Size AWG:24; No. Strands x Strand Size:19 x 36; Jacket Color:Yellow; Approval Bodies:UL; Approval Categories:UL AWM Style 1180; Passes VW-1 Flame Test; Cable/Wire MIL SPEC:MIL-W-16878/5 Type EE RoHS Compliant: Yes
|
Intersil, Corp. 数字电位 INTERSIL[Intersil Corporation]
|
| SD-87280-0400 0872800400 |
2.00mm (.079) Pitch Cable Holder, for Discrete Wire, Flat Cable and Ribbon Cable, 4 Circuits
|
Molex Electronics Ltd.
|
| SD-87280-0700 0872800700 |
2.00mm (.079) Pitch Cable Holder, for Discrete Wire, Flat Cable and Ribbon Cable, 7 Circuits
|
Molex Electronics Ltd.
|
| SD-87280-0600 0872800600 |
2.00mm (.079) Pitch Cable Holder, for Discrete Wire, Flat Cable and Ribbon Cable, 6 Circuits
|
Molex Electronics Ltd.
|
| 0871300900 87130-0900 |
2.50mm (.098) Pitch Cable Holder, for Discrete Wire, Flat Cable and Ribbon Cable 9 Circuits MOLEX Connector
|
Molex Electronics Ltd.
|
| 0871300400 87130-0400 |
2.50mm (.098) Pitch Cable Holder, for Discrete Wire, Flat Cable and Ribbon Cable 4 Circuits MOLEX Connector
|
Molex Electronics Ltd.
|
| 0871301500 87130-1500 |
2.50mm (.098) Pitch Cable Holder, for Discrete Wire, Flat Cable and Ribbon Cable 15 Circuits MOLEX Connector
|
Molex Electronics Ltd.
|
| DS28E35 |
DeepCover Secure Authenticator with 1-Wire ECDSA and 1Kb User EEPROM
|
Maxim Integrated Produc...
|
| DS28E35G-W231TW DS28E35DEMOK DS28E35P DS28E35PT DS |
DeepCover Secure Authenticator with 1-Wire ECDSA and 1Kb User EEPROM
|
MAXIM - Dallas Semiconductor
|
| DS2465P-W311TW DS2465QT DS2465QU |
DeepCover Secure Authenticator with SHA-256 Coprocessor and 1-Wire Master Function
|
MAXIM - Dallas Semiconductor
|
| 3365-26 3365-25 3365-15 3365-20 535356 3365-16 336 |
RIBBON CABLE 26 WAY 30.5M RIBBON CABLE 15 WAY 30.5M RIBBON CABLE 20 WAY 30.5M RIBBON CABLE 10 WAY 30.5M RIBBON CABLE 16 WAY 30.5M RIBBON CABLE 14 WAY 30.5M Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset RIBBON CABLE 40 WAY 30.5M RIBBON CABLE 60 WAY 30.5M Intel® Server Spare APP3STDBEZEL, Bezel with Door. For SC5295DP, SC5295BRP and SC5295WS 带状电缆每平方米25未来 RIBBON CABLE 15 WAY PER M 带状电缆每平方米15未来 RIBBON CABLE 34 WAY 30.5M 带状电缆34未来0.5 RIBBON CABLE 60 WAY PER M 带状电缆每平方米60未来 RIBBON CABLE 25 WAY 30.5M 带状电缆25未来30.5 RIBBON CABLE 50 WAY 30.5M 带状电缆50未来30.5
|
Jameco Electronics Molex, Inc. KEMET Corporation Amphenol, Corp. GE Measurement ?Control Solutions
|