| PART |
Description |
Maker |
| ISL8225MIRZ ISL8225MEVAL2Z JUMPER-3-100 JUMPER2-10 |
ISL8225MEVAL2Z 6-Phase, 90A Evaluation Board Setup Procedure
|
Intersil Corporation
|
| U123P U3089M U3079M U427BFP U3082M U2097B U3084M |
TRANSIL 3 stages RF power amplifier demonstration board using: PD57002-E, PD57018-E, 2 x PD57060-E RF power amplifier using 1 x PD55035S N-channel enhancement-mode lateral MOSFETs Interface IC Evaluation board using PD84002 for UHF RFID reader 接口IC Trisil" for telecom equipment protection 接口IC Evaluation board using PD84006L-E for 900 MHz 2-way radio
|
Jameco Electronics SIEMENS AG
|
| STEVAL-ISA007V1 |
High power 3-phase auxiliary power supply evaluation board Based on L5991 and ESBT STC08DE150HV
|
STMicroelectronics
|
| TM23P-88P HT601-TM23_TM22P-88P TM23R-TO6 TM23P-88P |
EVAL BOARD FOR CS5466 Development kit; Kit Contents:Evaluation Board and software; For Use With:CS5460A; Leaded Process Compatible:No; Peak Reflow Compatible (260 C):No RoHS Compliant: No Development kit; Kit Contents:Evaluation Board and software; For Use With:CS5471; Leaded Process Compatible:No; Peak Reflow Compatible (260 C):No RoHS Compliant: No EVAL BOARD FOR CS5524 ADC BOARD EVAL FOR CS42448 EVAL BOARD CS4271 STEREO CODEC EVAL BOARD CS42L51 CODEC Development kit; Kit Contents:Evaluation Board; For Use With:CS4228A; Leaded Process Compatible:No; Peak Reflow Compatible (260 C):No RoHS Compliant: No EVAL BOARD CS4270 CODEC Development kit; Kit Contents:Evaluation Board; For Use With:CS43122; Leaded Process Compatible:No; Peak Reflow Compatible (260 C):No RoHS Compliant: No 6类布线系统的数据连接 CAT 6 Data Wiring System Connectors 6类布线系统的数据连接 DSUB RoHS Compliant: Yes 6类布线系统的数据连接 EVAL BOARD CS5451A 6CH ADC 6类布线系统的数据连接 EVAL BOARD CS4272 STEREO CODEC 6类布线系统的数据连接
|
HIROSE[Hirose Electric] Hirose Electric USA, INC. HIROSE ELECTRIC Co., Ltd.
|
| 27C010RPFI-30 27C010RPFC-25 27C010RPFB-30 27C010RP |
x8 EPROM Evaluation Kit for the MAX3741 Evaluation Kit for the MAX3738 Evaluation Kit for the MAX3748A Evaluation Kit for the MAX3740A Evaluation Kit for the MAX3737 Evaluation Kit for the MAX3744, MAX3745 x8存储 Evaluation Kit for the MAX3747, MAX3747A x8存储
|
Atmel, Corp.
|
| STR910-EVAL |
Evaluation board for STR91xF Evaluation board for STR91xF
|
STMicroelectronics
|
| AOZ1020-EVA |
EZBuck 2A Simple Buck Regulator Evaluation Board Note EZBuck⑩ 2A Simple Buck Regulator Evaluation Board Note
|
Alpha & Omega Semiconductors
|
| MC14576CP MC14577CP MC141622FU MC7805 MC141622EVK_ |
From old datasheet system ACF-ll Evaluatlon Board Operatlng Manudal ACF-II Evaluation Board Operating Manual
|
MOTOROLA[Motorola Inc] ON Semi Motorola, Inc
|
| AD421 AD421BR EVAL-AD421EB AD421BN AD421BRRL EVAL- |
Loop-Powered 4 mA to 20 mA DAC Loop-Powered 4-20 mA DAC 18-Bit/ 2.5 LSB INL/ 570 kSPS SAR ADC 1 MSPS/ 12-Bit ADCs Evaluation Board for 1MSPS/ 12-Bit ADC SigmaDSP 3-Channel/ 26-Bit Signal Processing DAC Low Cost/ Low Power CMOS General Purpose Analog Front End EvaluationBoardforLowCost/LowPower/ CMOSGerneralPurposeDualAnalogFrontEnd Evaluation Board for 12-bit high speed/ low power/ successive-approximation ADC Evaluation Board AD1555/1556 24-Bit ADC 1.8 V/ Micro-Power/ 8/10/12-Bit ADCs in 6 Lead SOT-23 Evaluation Board for 1MSPS/ 12-/ 10-Bit ADCs 2.35 V to 5.25 V/ 1 MSPS/ 12-/10-/8-Bit ADCs in 6-Lead SC70 Multichannel 24-Bit/ 192 kHz/ DAC 2 ADC/ 8 DAC/ 96 kHz/ 24-Bit Codec Low Cost/ Low Power CMOS General-Purpose Dual Analog Front End AD73360L Evaluation Board/ Six Input Channel Analog Front End 3MSPS/ 12-Bit SAR ADC 2 ADC/ 6 DAC/ 96KHZ 24 BIT CODEC Differential Input/ Dual 2 MSPS/ 12-Bit/ 3-Channel SAR ADC Software Selectable True Bipolar Input/ 2-Channel/ 12-Bit Plus Sign ADC Differential Input/ 1MSPS/ 12-Bit ADC in SO-8 and S0-8 Evaluation Board for 10-bit high speed/ low power/ successive-approximation ADC 32-Channel/ 14-Bit Voltage-Output DAC 3MSPS/ 14-Bit SAR ADC
|
AD` AD[Analog Devices] ATMEL Corporation Analog Devices, Inc. http://
|
| 25AA640T-I/SN 25AA640-I/ST 25AA640-I/P 25LC640X-E/ |
Evaluation Kit for the MAX1715 Evaluation Kit for the MAX1879 Evaluation Kit for the MAX1864 3µs, 12-Bit ADC Evaluation Kit for the MAX1717 Notebook CPU Step-Down Controller for Intel Mobile Voltage Positioning (IMVP-II) SPI串行EEPROM
|
Luxo, Corp.
|
| 5962-8757902XC 5962-8757901YX 5962-8757901XX 5962- |
Evaluation Kit for the MAX9713 500mW, Low EMI, Filterless, Class D Audio Amplifier Evaluation Kit for the MAX9710 Evaluation Kit for the MAX9716 Low-Cost, Mono/Stereo, 1.4W Differential Audio Power Amplifiers Evaluation Kit for the MAX9715 Evaluation Kit for the MAX9704, MAX9714 Evaluation Kit/Evaluation System for the MAX9851 Transceiver 收发 Low-Cost, Mono, 1.4W BTL Audio Power Amplifiers 收发
|
Air Cost Control Vishay Intertechnology, Inc.
|
| 25C040-P 25AA040-P 25LC040-P 25C040X-ST 25C040IN 2 |
Evaluation Kit for the MAX1748, MAX1779 Evaluation Kit for the MAX16803 Evaluation Kit for the MAX1760 High-Voltage, Step-Down DC-DC Controller in µMAX 500mA Low-Dropout Linear Regulator in UCSP Industry-Standard, 12-Bit ADC with Reference Evaluation Kit for the MAX1757, MAX1758 60mA, SOT23 Inverting Charge Pump with Shutdown Evaluation Kit for the MAX1700, MAX1701 125mA, Frequency-Selectable, Switched-Capacitor Voltage Converters Evaluation Kit for the MAX1684, MAX1685 Evaluation Kit for the MAX1698 Evaluation Kit for the MAX1692 Evaluation Kit for the MAX1703 Evaluation Kit for the MAX1820, MAX1821 Complete, 100ksps, 8-Channel, 12-Bit Data Acquisition Systems SPI串行EEPROM High-Voltage, 350mA, Adjustable Linear High-Brightness LED (HB LED) Driver SPI串行EEPROM Evaluation Kit for the MAX1744, MAX1745 SPI串行EEPROM SPI Serial EEPROM SPI串行EEPROM
|
Microchip Technology, Inc.
|